2015
in industrial construction since
40,000 m²
7+ years
19 projects
of industrial space built
built for BAT
for one client over 3 years
WHAT WE BUILD
Construction from $150 per m². We give the exact price and timeline for your project after a site visit.
01
Storage and blast-freezing chambers, compressor room, primary processing area
03
Production building with an admin block, substation, boiler house and treatment facilities. We bring utilities to your equipment.
04
Expansion, extensions, conversion of warehouses for production, replacement of utilities.
HOW WE WORK
1
Application and departure
We inspect the site and clarify the technology and building requirements.
4
Construction
Every week we send a photo report and a schedule update.
2
Quote in 48 hours
Preliminary estimate and timeline by stage.
5
Handover and warranty
We hand over the facility and documents. 18-month warranty.
3
Contract
Fixed estimate and handover date written into the contract
One contract for the whole project
You don't need to hire and coordinate five contractors. One company is responsible for deadlines, budget and quality.
Earthworks and concrete works
Fabrication and erection of steel structures
Roofing and facades
Electrical, water supply, sewerage
External utilities and equipment connection
Admin block finishing and landscaping
We work to international standards
ISO certificates, licences and acceptance reports for every stage
ISO 9001
quality management
ISO 45001
health and safety
ISO 14001
environmental management
18 months
contractual warranty
COMPLETED PROJECTS



Food industry · Bulungur district · 2022–2023
Receiving and processing building at the blast-freezing plant
Task: add a receiving building with cold rooms to an operating plant and launch it before the season. The site lay below the production level, so we built up more than 4 m of fill with layer-by-layer compaction and reinforced it with a pile foundation.
1,000+ m²
processing building
3 cold rooms
of cold storage


5 months
from start of works to launch
Result: the facility was put into operation before the season began.
Client review: Shukhrat Khudayarov, Chief Engineer
The site lay 4 metres below production level, and the building had to be handed over before the season. It was done in 5 months, and the season started on time. We have worked with BDA for more than 7 years.

Industrial infrastructure · Samarkand · 2024–2025
Treatment facilities and water storage system at an operating BAT factory
Task: create a system for collecting and reusing treated water as part of the plant's environmental project. It had to be built on the site of an old silted pond without stopping the factory's infrastructure. We cleaned the pond and removed the silt, built a concrete reservoir for treated water and a second one lined with geomembrane, installed concrete channels to collect rainwater and tied everything into the plant's system.

5,000+ m²
reservoir area
9,000+ m³
water storage volume
2 types
concrete and geomembrane reservoirs
Result: the plant reuses treated water and rainwater, and the work was done without stopping any infrastructure.
Client review: Shukhrat Zakirov, Chief Engineer
We built on the site of an old pond next to an operating factory and did not stop a single one of its systems. The team resolved issues on its own and agreed them with us in advance. We continue to trust BDA with new projects.


Reconstruction · Samarkand · 2023
Warehouses converted for production at an operating factory
Task: turn warehouse premises into a production area with process lines without stopping the plant. We isolated the area from the operating workshop, installed climate control for temperature, humidity and air cleanliness, built the utility and low-voltage systems, connected the lines and fitted out offices inside the workshop.
2,000+ m²
reconstructed
4 months
construction time
0 days
plant downtime
Result: the lines were launched on time, the microclimate is stable to process requirements, and the plant never stopped.
Client review: Shukhrat Zakirov, Chief Engineer
The warehouses were turned into a production area in 4 months, and the factory did not stop for a single day. The team resolved climate and equipment questions with our engineers in advance, so the lines were launched on time.
CLIENT REVIEWS
YOUR PROJECT ESTIMATE IN 48 HOURS
Leave a request. An engineer will call you back, clarify the task and send a preliminary estimate with a timeline.
Phone: +998 (93) 999-06-66