top of page
Company logo

 since 2015 · projects across Uzbekistan

TURNKEY FACTORIES AND WAREHOUSES

One contract, a fixed estimate, the deadline in the contract. We design, build and connect utilities for private and foreign investors.

2015

in industrial construction since

40,000 m²

7+ years

19 projects

of industrial space built 

built for BAT

for one client over 3 years

WHAT WE BUILD

Construction from $150 per m². We give the exact price and timeline for your project after a site visit.

01

Storage and blast-freezing chambers, compressor room, primary processing area

02

Steel frame, sandwich panels, industrial concrete floor, loading ramps and canopies.

03

Production building with an admin block, substation, boiler house and treatment facilities. We bring utilities to your equipment.

04

Expansion, extensions, conversion of warehouses for production, replacement of utilities.

ЧТО МЫ СТРОИМ

HOW WE WORK

1

Application and departure

We inspect the site and clarify the technology and building requirements.

4

Construction

Every week we send a photo report and a schedule update.

2

Quote in 48 hours

Preliminary estimate and timeline by stage.

5

Handover and warranty

We hand over the facility and documents. 18-month warranty.

3

Contract

Fixed estimate and handover date written into the contract

One contract for the whole project

You don't need to hire and coordinate five contractors. One company is responsible for deadlines, budget and quality.

Earthworks and concrete works

Fabrication and erection of steel structures

Roofing and facades

Electrical, water supply, sewerage 

External utilities and equipment connection

Admin block finishing and landscaping 

We work to international standards

ISO certificates, licences and acceptance reports for every stage

ISO 9001

quality management

ISO 45001

health and safety

ISO 14001

environmental management

18 months

contractual warranty

COMPLETED PROJECTS

Blast-freezing plant building in Bulungur district, built by BDA
Earthworks and layer-by-layer filling at the blast-freezing plant site
Pile foundation works for the blast-freezing plant in Bulungur

Food industry · Bulungur district · 2022–2023

Receiving and processing building at the blast-freezing plant

Task: add a receiving building with cold rooms to an operating plant and launch it before the season. The site lay below the production level, so we built up more than 4 m of fill with layer-by-layer compaction and reinforced it with a pile foundation.

1,000+ m²

processing building

3 cold rooms

of cold storage

IMG_20210805_175504.jpg
Facade of the receiving and processing building at the blast-freezing plant

5 months

from start of works to launch

Result: the facility was put into operation before the season began.

Client review: Shukhrat Khudayarov, Chief Engineer

The site lay 4 metres below production level, and the building had to be handed over before the season. It was done in 5 months, and the season started on time. We have worked with BDA for more than 7 years.

20250411_104104.mp4_snapshot_00.08.037.jpg

Industrial infrastructure · Samarkand · 2024–2025

Treatment facilities and water storage system at an operating BAT factory

Task: create a system for collecting and reusing treated water as part of the plant's environmental project. It had to be built on the site of an old silted pond without stopping the factory's infrastructure. We cleaned the pond and removed the silt, built a concrete reservoir for treated water and a second one lined with geomembrane, installed concrete channels to collect rainwater and tied everything into the plant's system.

Geomembrane-lined reservoir for water reuse at the BAT factory

5,000+ m²

reservoir area

9,000+ m³

water storage volume

2 types

concrete and geomembrane reservoirs

Result: the plant reuses treated water and rainwater, and the work was done without stopping any infrastructure.

Client review: Shukhrat Zakirov, Chief Engineer

We built on the site of an old pond next to an operating factory and did not stop a single one of its systems. The team resolved issues on its own and agreed them with us in advance. We continue to trust BDA with new projects.

Isolating the work area during reconstruction of a warehouse for production in Samarkand
photo_2024-01-30_19-39-41.jpg

Reconstruction · Samarkand · 2023

Warehouses converted for production at an operating factory

Task: turn warehouse premises into a production area with process lines without stopping the plant. We isolated the area from the operating workshop, installed climate control for temperature, humidity and air cleanliness, built the utility and low-voltage systems, connected the lines and fitted out offices inside the workshop.

2,000+ m²

reconstructed

4 months

construction time

0 days

plant downtime

Result: the lines were launched on time, the microclimate is stable to process requirements, and the plant never stopped.

Client review: Shukhrat Zakirov, Chief Engineer

The warehouses were turned into a production area in 4 months, and the factory did not stop for a single day. The team resolved climate and equipment questions with our engineers in advance, so the lines were launched on time.

CLIENT  REVIEWS

YOUR PROJECT ESTIMATE IN 48 HOURS

Leave a request. An engineer will call you back, clarify the task and send a preliminary estimate with a timeline.

  • Youtube
  • Whatsapp
  • Телеграмма
  • Instagram
Facility type
КОНТАКТЫ
bottom of page