Blast-freezing plant building in Bulungur district, built by BDA
Earthworks and layer-by-layer filling at the blast-freezing plant site
Pile foundation works for the blast-freezing plant in Bulungur

Food industry · Bulungur district · 2022–2023

Receiving and processing building at the blast-freezing plant

Task: add a receiving building with cold rooms to an operating plant and launch it before the season began. For the client, a delay would have meant losing an entire processing season.

​

Challenge: the site lay more than 4 metres below the production level. We built up an embankment with layer-by-layer compaction and checked every layer, then reinforced the base with piles so that the building with its heavy refrigeration equipment stands securely.

​

How we worked: earthworks and concrete, the steel frame, sandwich panels, cold rooms and utilities were all handled by one BDA team. Every week the client received a photo report and a schedule update, so deadlines were under control from day one.

1,000+ m²

processing building

3 cold rooms

of cold storage

Steel frame of the blast-freezing plant building during erection
Facade of the receiving and processing building at the blast-freezing plant

5 months

from start of works to launch

Result: the facility was put into operation before the season began.

Client review: Shukhrat Khudayarov, Chief Engineer

The site lay 4 metres below production level, and the building had to be handed over before the season. It was done in 5 months, and the season started on time. We have worked with BDA for more than 7 years.

bottom of page