Receiving and processing building at the blast-freezing plant
Task: add a receiving building with cold rooms to an operating plant and launch it before the season began. For the client, a delay would have meant losing an entire processing season.
Challenge: the site lay more than 4 metres below the production level. We built up an embankment with layer-by-layer compaction and checked every layer, then reinforced the base with piles so that the building with its heavy refrigeration equipment stands securely.
How we worked: earthworks and concrete, the steel frame, sandwich panels, cold rooms and utilities were all handled by one BDA team. Every week the client received a photo report and a schedule update, so deadlines were under control from day one.
1,000+ m²
processing building
3 cold rooms
of cold storage


5 months
from start of works to launch
Result: the facility was put into operation before the season began.
Client review: Shukhrat Khudayarov, Chief Engineer
The site lay 4 metres below production level, and the building had to be handed over before the season. It was done in 5 months, and the season started on time. We have worked with BDA for more than 7 years.