Industrial infrastructure · Samarkand · 2024–2025

Treatment facilities and water storage system at an operating BAT factory

Task: create a system for collecting and reusing treated water as part of the factory's environmental project. It had to be built on the site of an old silted pond, next to an operating production facility.

​

What we did: cleaned the pond and removed the silt, built a concrete reservoir for treated water and a second one lined with geomembrane, installed concrete channels to collect rainwater and tied everything into the plant's utility system.

​

How we worked: every stage was agreed in advance with the factory's services, and work was organised so that none of the plant's systems stopped. For an international company with strict health, safety and environmental requirements, this was the key condition — and we met it.

Geomembrane-lined reservoir for water reuse at the BAT factory

5,000+ m²

reservoir area

9,000+ m³

water storage volume

2 types

concrete and geomembrane reservoirs

Result: the plant reuses treated water and rainwater, and the work was done without stopping any infrastructure.

Client review: Shukhrat Zakirov, Chief Engineer

We built on the site of an old pond next to an operating factory and did not stop a single one of its systems. The team resolved issues on its own and agreed them with us in advance. We continue to trust BDA with new projects.