Reconstruction · Samarkand · 2023

Warehouses converted for production at an operating factory

The challenge: transform warehouse space into a production area with technological lines without stopping the factory's operations for a single day.

What we did: We isolated the area from the operating workshop, installed climate control for temperature, humidity, and air quality, installed utility and low-current systems, connected power lines, and set up office space within the workshop.

How it worked: Microclimate and equipment requirements were agreed upon with the client's engineers before work began. Thanks to this, the site was ready in four months, the production lines were launched on schedule, and the factory didn't lose a single day of work.

Installing utility systems in a warehouse reconstructed for production

2,000+ m²

reconstructed

4 months

construction time

0 days

plant downtime

Result: the lines were launched on time, the microclimate is stable to process requirements, and the plant never stopped.

Client review: Shukhrat Zakirov, Chief Engineer

The warehouses were turned into a production area in 4 months, and the factory did not stop for a single day. The team resolved climate and equipment questions with our engineers in advance, so the lines were launched on time.